Friday, May 6, 2011

Kitchen Lighting



The stairway was cleaned today. The electrical was installed in the fireplace built ins. The kitchen lighting looks stunning!



























Wednesday, May 4, 2011

More Upstairs Painting

Do you remember the upstairs, bright red bathroom? It is red no more! The second new bedroom is a calm, but cheery, yellow.
The neighbors, Ron and Harriet, stopped by to take a look and give their approval today.











Custom Built Ins



The glass in the built in cabinetry has been installed. The next step will be the lights.









Kitchen Backsplash

The kitchen backsplash is installed and finished. Just waiting for the electrical trim out and hood installation.





New Entry Look



The wallpaper came down. The walls were painted and the entry door and trim got a facelift too.



Main Floor Painting



The painting is being completed on the main floor. The trim stands out beautifully against the wall colors. Even the front entry door got a new coat of paint!



























Kitchen Countertop Installation

The kitchen countertops were installed the last week of April. If you look closely you can see the tile backsplash starting to take shape.



















Master Bath Fixtures



The clawfoot bathtub was installed in the master bath. The shower head was installed. The fixtures fit beautifully with the age of the home.